SRRP Injection Moldingsales@srrp.com.cn ↗

Injection molding project start

Engineering review

Send the non-confidential project context first. We will confirm the responsible reviewer, NDA requirement and private transfer route before you share CAD or controlled drawings.

This static website does not accept file uploads. We confirm the NDA need and secure file-sharing method first.

Request secure file sharing

Share files securely

Tell us what kind of project you have, the application, demand and timing. After the request is sent, the project owner can confirm file format, access, NDA and review scope.

Typical engineering files STEP / STP · X_T · IGES · DWG / DXF · PDF · reference photos Never include export-controlled, personal or other restricted data until the transfer method and access boundary are agreed.
LocationShijiazhuang, Hebei, China

After you send the brief

What happens next

The first response should reduce uncertainty, not just acknowledge an email. Timing depends on the information available and the need for NDA, physical samples or mold inspection.

Gate 01A / Triage + confidentiality

Confirm the project path, responsible reviewer, NDA need and secure route for CAD, drawings or controlled records.

Gate 01B / Engineering question list

Identify missing application, material, CTQ, volume, tool, quality, packing and timing information before assumptions become commitments.

Gate 02A / Route + quotation basis

Align the proposed engineering, tooling, molding, inspection and supply route together with exclusions and project-specific evidence.

Gate 02B / Kickoff authorization

Release work only after revisions, ownership, acceptance points, change authority and the next decision gate are understood.