Part architecture
Review wall transitions, draft, ribs, bosses, undercuts, shutoffs, shrink behavior, assembly interfaces and critical dimensions before the tool direction is released.
WALL / DRAFT / RIBS / BOSSESThe brief becomes visible
Drawing, resin, volume and use environment
DFM notes, risk points and tooling route
First article, quality criteria and repeat handoff
01 / Engineering decisions
DFM is not a generic checklist. Geometry, material behavior and tool strategy must be reviewed together against the application, annual demand and customer approval plan.
Review wall transitions, draft, ribs, bosses, undercuts, shutoffs, shrink behavior, assembly interfaces and critical dimensions before the tool direction is released.
WALL / DRAFT / RIBS / BOSSES
Translate temperature, load, chemical contact, UV exposure, flame needs, appearance and cost into a resin shortlist that can be verified with the application.
SERVICE / RESIN / FINISH / COST
Align parting, gate, cooling, venting, ejection, cavity strategy, first-article checks and correction loops before production timing becomes a commitment.
GATE / EJECTION / TRIAL / RELEASEEngineering, tooling and production workflow · project team, tools and approval records are identified in the quotation
02 / RFQ clarity
The goal is not a longer form. It is a cleaner first conversation — enough context for engineering to identify risk, recommend a route and return useful next steps.
RESPONSE ROUTE / SALES + ENGINEERING / CONFIDENTIAL PROJECT DISCUSSION
03 / Delivery path
Project intake and quotation are master gates 01–02. These six engineering-to-supply gates continue the same lifecycle without creating a second numbering system.
Confirm application, CTQs, environment, volume, appearance and release evidence. Gate output: requirement and assumption register.
Resolve wall, draft, ribs, bosses, shrink, resin behavior and assembly interfaces. Gate output: closed DFM actions and resin basis.
Define parting, gate, cavity, cooling, venting, ejection, mold life and ownership. Gate output: reviewed mold specification.
Build, bench, sample and close trial defects through documented correction loops. Gate output: traceable samples and issue closure.
Establish a repeatable setup and process window, then approve fit, appearance, function and critical dimensions. Gate output: approved part and released process basis.
Control material, startup, in-process checks, traceability, packing, mold condition and engineering changes. Gate output: lot release and controlled lifecycle records.
PRODUCTION RELEASE
04 / Make the factory part of the brief
A dependable supplier should show more than polished parts. It should explain who owns the brief, where decisions are recorded, how the first article is judged and what remains controlled when the project becomes repeat production.
PROJECT OWNER / DFM RECORD / INSPECTION EVIDENCE / REPEAT HANDOFF
Ready to make the next run easier?
Start with a drawing, a model or a problem to solve. We will shape the next engineering conversation around the application.