SRRP Injection MoldingQuality system ↗

Certification / verification before badges

A certificate must match the work.

The customer files include certificate imagery, but the extracted material does not establish current certificate number, issuer, expiry, site and scope clearly enough for a public badge. SRRP therefore publishes the verification status instead of inventing certainty.

Customer-supplied operator and inspection workstation evidence
Public badge statusNot published until entity, site, scope, issuer and validity are verified.
Source materialCertificate imagery supplied
Public claimNo unverified standard badge
Project routeCurrent copy available for due diligence

Verification status

What is known—and what still needs proof.

This page deliberately treats unknown values as unknown. Once current documents are supplied, the register can publish standard, certificate holder, site, scope, issuer, issue/expiry dates and verification link where appropriate.

Verification fieldPublic statusWhy it mattersPublication rule
Legal certificate holderConfirmation requiredMust match the entity represented in the projectPublish exact registered name only from current certificate
Manufacturing siteConfirmation requiredA certificate may cover one site but not anotherMatch address to the proposed production site
Standard + scopeConfirmation requiredThe scope must include the relevant injection molding activityQuote exact standard and certified scope without paraphrase
Issuer / accreditationConfirmation requiredSupports authenticity and recognitionVerify against issuer or authoritative record where available
Issue + expiryConfirmation requiredAn expired certificate is not current evidenceShow dates and review status; remove stale badges
Project applicabilityWritten quotationPartner/site responsibility must be visibleIdentify the certified site and quality owner for the order
Current public position. SRRP does not display ISO, IATF or other certification logos as confirmed website claims because the available extracted files do not yet prove the exact current holder, site, scope and validity. Buyers may request the current due-diligence pack for the proposed production route.

Due-diligence sequence

Verify the certificate against the order.

A real certificate is only one part of supplier assurance. The process and release evidence still need to match the molded component.

01

Identify entity

Match registered holder and address to the organization represented.

02

Confirm validity

Check issuer, certificate number, dates and authoritative status.

03

Read scope

Confirm the standard and scope apply to the relevant site and activity.

04

Map project

Connect the certified route to the actual tool, press, inspection and quality owner.

What still builds trust

Do not let the badge replace process evidence.

For a custom injection molded part, the buyer still needs controlled inputs, first-off approval, inspection records, traceability, nonconformance handling and change review.

Requirement

Controlled revision

Current drawing, thermoplastic grade, color and critical characteristics.

Approval

First-off record

Sample identity, measurement, appearance, fit and agreed functional evidence.

Production

Release controls

Startup, in-process checks, lot identity, packing and shipment records.